Commit Graph

13 Commits

Author SHA1 Message Date
b3608ecfd7 Rename the simulator to Overwatch and organize the repository for presentation.
Some checks failed
AERIS-10 CI / Python Lint + Tests (push) Has been cancelled
AERIS-10 CI / MCU Firmware Tests (push) Has been cancelled
AERIS-10 CI / FPGA Regression (push) Has been cancelled
AERIS-10 CI / Cross-Layer Contract Tests (push) Has been cancelled
The operator interface now uses that name. The radar design, parts list, and simulation sit in separate directories, and the earlier simulator and project license are removed.

Co-authored-by: Cursor <cursoragent@cursor.com>
2026-10-21 06:04:46 +00:00
Jason
d5d28e9f1c Build 25 engineering report: MTI canceller + DC notch timing PASS
Build 25 results (MTI + DC notch integration):
- WNS +0.132 ns, WHS +0.058 ns (all domains PASS)
- 9,252 LUTs, 12,488 FFs, 17 BRAM, 142 DSP, 0.753 W
- MTI cost: +694 LUTs, +2,104 FFs, 0 BRAM, 0 DSP
- Bitstream: radar_system_top_build25.bit (production-safe)
- 23/23 FPGA regression, 29/29 MTI checks, 3/3 real-data co-sim

Updated reports.html (15-point Build 25 report), implementation-log.html
(timeline entries for production fixes, CFAR, MTI), and release-notes.html
(new tagged releases, gap status update).
2026-03-20 16:59:30 +02:00
Jason
075ae1e77a Add Build 24 15-point engineering report: timing, utilization, DSP/BRAM breakdown, power, DRC, methodology, congestion, routing, logic levels, build comparison, CFAR cost, verification summary 2026-03-20 05:47:20 +02:00
Jason
19284ac277 Build 21 docs + TCL fix: WNS +0.156ns, 139 DSP, tag v0.1.4-build21
Build 21 Vivado results extracted and documented:
- WNS +0.156 ns, WHS +0.064 ns, WPWS +0.361 ns (all timing met)
- 6,192 LUTs (4.6%), 9,064 FFs (3.4%), 16 BRAM (4.4%), 139 DSP48E1 (18.8%)
- Total power: 0.732 W
- Barrel-shift twiddle freed 1 DSP (140 -> 139) as expected
- TCL script fix: wrap check_timing in catch (Vivado 2025.2 bug)
- Updated release-notes.html, implementation-log.html, reports.html
2026-03-20 02:21:33 +02:00
Jason
a31b4ec484 Update docs for FFT optimizations + E2E test + RTL fixes (19/19 FPGA regression) 2026-03-20 01:46:24 +02:00
Jason
02b3b68e00 Update docs for Gap 2 GUI Settings completion (5 of 7 gaps closed) 2026-03-19 23:58:37 +02:00
Jason
d2f20f5c15 Update docs for Build 20 (v0.1.3-build20) stable release + Gaps 3-7 status
- release-notes.html: Add commits for Gaps 3-5-7-4, tagged releases table,
  architectural gap status table, updated GitHub links
- implementation-log.html: Add Build 20/19/18 timeline entries, Gap 3-4-5
  milestones, updated quality/build history sections
- reports.html: Update FPGA status to Build 20 baseline, MCU regression
  to 20/20, report currency notice with current gap status
2026-03-19 23:22:38 +02:00
Jason
f16d9524e5 Add board-day worksheet and cross-link bring-up docs 2026-03-19 15:25:23 +02:00
Jason
e62f3cd950 Port validated Build 16 XDC cleanup and sync docs 2026-03-19 14:34:26 +02:00
Jason
3755ee6302 Publish Simulation Report v2 aligned to current FPGA baseline 2026-03-18 21:51:08 +02:00
Jason
5710f7a83e Annotate report currency status and flag legacy simulation PDF 2026-03-18 21:46:52 +02:00
Jason
cad804c347 Add release notes page keyed to major bring-up commits 2026-03-18 21:41:56 +02:00
Jason
94eed1e933 Expand GitHub Pages into full engineering documentation site 2026-03-18 21:40:44 +02:00